| Potential Capital: | From ৫০০০০০০ taka To ১০০০০০০০০ taka | |||
|---|---|---|---|---|
| Potential Gain: | Tk. 1 crore to Tk. 5 crore |
|||
| Required Materials: | Embankment, turbine, generator, transformer, supply line, Meter, Capacitor, station ferry, technical staff, expert engineers, consultants and insurance documents. |
|||
| Preparation Method: | Hydropower is produced from river water the current is strong. This is a renewable energy. First create a dam on a high current river and keep a portion free. The turbine will be fixed at the free space. The station ferry is to be set up at a reasonable distance. The current will be stronger as it would get obstruction. The current will be transformed into power by the turbine. It can be given to the supply line and reserved in the transformer. |
|||
| Marketing: | High demand as the power shortage is high. |
|||
| Ability: | Experienced technical staff. |
|||
The government is working tirelessly to ensure education for all. But no one is taking initiative for the employment of these educated people. Unemployment is rising at a mathematical rate. And so the young people are drowning in despair in the job market. There is intelligence, there is desire to give labor but there is no way to know. So labor is being wasted through various social crimes. Unrest is also growing in the family. I don't know the way of liberation, but I want liberation. We LuckyIdeaBD.com tell you the way out of that frustrating world. Welcome to our world.
Read More